Introducing PumperDump’s New 5m3 Patent Pending Blowback Bin

PumperDump introduces its new 5m3 blowback bin, designed to save costs, reduce truck movements, and eliminate plastic waste. Discover how this innovation benefits builders, concreters, and suppliers while improving sustainability across Sydney’s concrete industry.

Transforming industry experience, a wealth of knowledge, and continuous system innovation, PumperDump has been a key player in concrete pumping and concrete waste collection for years. With the roaring success of the 2m3 (2 Cubic Meter) blowback bin launched more than 10 years ago, we noticed a gap in the market for a larger option. After months of planning and trialling, we are proud to introduce the new 5m3 (5 Cubic Meter) blowback bin to the streets of Sydney. Our latest innovation would not have been possible without the collaboration of several important industry partners.

Industry Collaboration

We would like to thank:
Bincorp – for manufacturing the bin
De Martin & Gasparini – for assisting during construction and trialling the bin
WATPAC – for permitting the bin to be trialled on their site
Azzurri Concrete – for input during construction

Efficiency Improvements

This video shows a second blowback in the same bin without being emptied. PumperDump believes this modest improvement can save concrete pumping companies, builders, and concrete suppliers money over the duration of a project.

How It Works

While the delivery line is short and the bin is in place, you can get multiple blowbacks into the same bin before it needs emptying. Depending on who is paying for the blowback truck, this can reduce blowback costs considerably. The bin is also available immediately if any issues occur during the pour — no waiting for a blowback truck when time is critical.

Sustainability Benefits

For builders, concreters, and concrete suppliers who care about sustainability:
Less truck movement reduces carbon usage associated with blowouts
Elimination of plastic in equipment and waste streams aligns with PumperDump’s no-plastic policy

Concrete Supplier Advantages

Concrete suppliers benefit because:
• There’s no need to immediately cart concrete to the yard
Fuel consumption is reduced
Turnaround time for the next load is quicker
Tipping or carting fees for waste concrete are minimized

Depending on your role in the industry, there are clear savings for everyone.

Limited Availability

As this is a new system, we have a very limited number of 5m3 bins. Nonetheless, we are happy to talk to any party interested in using a 5m3 bin for current or upcoming projects.

Facebook
LinkedIn
X
Email
Pumperdump concrete waste removal and recycle Sydney